Private School Construction – Building your team early

Part one of our private school construction series explores how building your team early puts your capital project on track to deliver a facility that will inspire for years to come

OUR private school CONSTRUCTION SERIES

Our private school construction series explores different facets of the private school construction process. It provides education executives and their teams high level insights and tools to navigate their capital projects.

Part one of our private school construction series features content from our eBook: Private School Construction – 8 Best Practices for K-12 Education Executives Facing a Capital Project. Today, we’re exploring one key element for success: building your team early.
Campbell Hall Interior Night Arts Classroom

Build your team early

You know you want to collaborate with your team, but you’re also going to want your team to collaborate with each other. And you’re going to want them to collaborate early. It helps to spot holes and reduce the potential for costly change orders later.

Collaborating harnesses the talent and insight of all participants, reduces waste and optimizes efficiency. One way to start the collaboration process is to involve all stakeholders and consultants from the earliest practical and responsible moment, and lead an approach where all participants commit to work as a team for the best interests of the project.

One common mistake is assuming you need to bring a specific consultant on board only as her or his part of the project starts. However, you’ll need some crucial consultants earlier than you might expect.

For example, on a large project you may want a geological engineer upfront so s/he can give the limits on the foundation while you are still in the early phases of design. If you are building a new building, you may want a facilities engineer at the beginning. Leveraging your consultants early can highlight logistical issues you’re going to encounter and help you think through the process.

Though you may be doing some of this work as an initial investment prior to the bulk of your fundraising, you’ll be getting the early due diligence out of the way. It’s also a sign to funders that you are serious about the project. Additionally, the information you gain from, for example, having civil and soils engineers explore the land of the site is often timeless and will likely be just as relevant 15 years down the road.
Harvard Westlake Munger Hall Exterior Evening

Shared values lead to success

As you bring consultants on board, seek team members who are on the same page in terms of culture and values. Then, aim to build relationships with them.

Here’s one project executive’s story of how sharing values supports finding innovative solutions:

There is a certainty on the campus of one of our clients: boulders under the surface of the grade, and oak trees.

Preserving the Heritage oaks that are the trademark of the campus was always the most important task we had to consider. The dorm we were building was unique. The footprint of the 50-year-old building was under the canopy of several 100-year-old oak trees. Therefore, we could not demolish 100% of the building. If we had, the building department would not have permitted a new facility, since the oaks take precedence.

Instead, we demolished the part of the building above the 1st floor and built on the existing footprint. For the new additions to the building – which weren’t under the canopy – we drilled 110 caissons 50’ deep though huge boulders to create a foundation.

We had to do this because the standard continuous footings were not possible. Continuous footings would have damaged the feeder roots for the oaks, and it was uncertain if the trees could tolerate the shock. The school was concerned that the shock would cause the trees to die in ten years.

To mitigate this concern, we poured grade beams between the caissons that were formed above grade. That way we didn’t disturb the root system. It was the most innovative of all the work we did out there.

Thacher Casa Dorm Exterior

Trusting your relationships and having a shared philosophy creates value

Construction impacts life heavily and creates huge inconveniences for lots of people — including neighbors. Getting the right consultants on board helps minimize impacts and maximize the quality of the building and the time frame.

I knew I wasn’t going to be the guy at the weekly meeting. You have to be able to trust everybody around the table because it gets so complicated. –Head, Private K-12 Day School

Marlborough School Construction

For more on how to your capital project’s team and other best practices, download our free eBook Private School Construction – 8 Best Practices for K-12 Education Executives Facing a Capital Project.