Kirk Douglas Theatre

Location

Culver City

Owner

Center Theatre Group

Architect

Steven Ehrlich Architects

Construction Manager / Owner's Rep

Beck Madson Associates, Inc.

Project Size

21,600 SF

Restoration and conversion of a 21,600 sf abandoned movie theater into a live theater building. The Kirk Douglas Theatre project required demolition, hazardous material abatement, structural strengthening and historical preservation. The Type 3 building is a concrete slab on grade with a second level and mechanical mezzanine. The roof structure is composed of existing wooden bow trusses. Exterior walls consist of existing poured-in-place concrete.

Proto Credit: Elon Schoenholz